1Gbps vs 10Gbps Leased Line: Which Should You Order?

Gigabit is the UK SME default and ten-gigabit sounds like a different league. In practice the two overlap more than the names suggest, because carriers now install 10Gbps bearers as standard and price the committed rate. A balanced look at what each costs, who genuinely needs ten gigabits, and the bearer decision that saves a second installation.

FreeNo commitmentResponse within 2 hours

Trusted by
HBO
eHarmony
Hyundai
St Mary's
NHS
Sony
Vistry Group
HBO
eHarmony
Hyundai
St Mary's
NHS
Sony
Vistry Group

Key Facts

£129/mo1Gbps leased line from, in well-served UK city postcodes
£349/mo10Gbps leased line from, in well-served UK city postcodes
10xthe capacity for well under ten times the price at the entry point of each tier
30 to 90working days from order to live service for either tier; longer where new fibre or optics are needed

Quick answer

A 1Gbps leased line, from £129/month, is the right order for almost every single-site business: it carries several hundred cloud users, hosted telephony and video with headroom. A 10Gbps leased line, from £349/month, is for campuses, multi-site aggregation, media and engineering workloads, and buildings that resell connectivity to tenants. The decision that matters more than either is the bearer: in well-served postcodes a 10Gbps bearer with 1Gbps or 2Gbps committed costs little more than a plain gigabit circuit and upgrades by configuration, so growing sites should price it alongside 1Gbps.

Written by Nathan Hill-Haimes, Co-Founder, AMVIA

1Gbps vs 10Gbps Leased Line

Feature
1Gbps Leased Linefrom £129/moRecommended
10Gbps Leased Linefrom £349/mo
Symmetric, uncontended, SLA-backed
Typical buyerSingle-site SMEs, 20 to 300 staff, cloud-heavyCampuses, multi-site hubs, media, engineering, multi-tenant buildings
Typical monthly cost (well-served postcode)£129 to £700£349 to £850
Typical monthly cost (harder-to-reach)Up to £1,200+Up to £1,200+ plus build charges
Hand-off to your equipment1GBASE copper or optical; most firewalls fine10GBASE optical; firewall and switch must run at line rate
Upgrade pathTo 10Gbps only if delivered on a 10Gbps bearerCommitted rate raised by configuration up to 10Gbps
Install lead time30 to 90 working days30 to 90 working days; longer where new optics or fibre are needed
AvailabilityAlmost every UK commercial postcodeMost city-centre buildings; elsewhere needs 10Gbps-capable fibre to the site
Common mistakeOrdering a 1Gbps bearer at a growing siteBuying 10Gbps for a single office that uses 400Mbps at peak

When to Choose Each Option

Choose 1Gbps if...

You are a single site of up to a few hundred staff on cloud applications, hosted telephony and video. A gigabit circuit carries that with headroom; the busiest such sites peak at a few hundred megabits. Ask for it on a 10Gbps bearer if the site is growing.

Choose 10Gbps if...

You aggregate several sites or many hundreds of users onto one circuit, you move large data sets daily (media, CAD, simulation, nightly replication), or you are a landlord, co-working operator or MSP reselling bandwidth inside the building.

Choose a 10Gbps bearer with a lower committed rate if...

You need 1Gbps or 2Gbps today and expect to need more within the contract term. The bearer sets the ceiling, the committed rate sets the bill, and the upgrade is a configuration change rather than a second installation.

Cost-Benefit Analysis

At the entry point of each tier, 10Gbps costs under three times 1Gbps for ten times the capacity, which is why it tempts single-site buyers who will never use it. The cheaper discipline is to buy the committed rate you use and the bearer you will grow into. A second installation when a 1Gbps bearer runs out costs another survey, another 30 to 90 working-day lead time and often another install charge; a 10Gbps bearer ordered at the start avoids all three for a modest monthly uplift.

See the 10Gbps leased line cost guide

The AMVIA Recommendation

The AMVIA Recommendation

Single site, under a few hundred staff: order 1Gbps, and if the site is growing, ask for it on a 10Gbps bearer with the upgrade steps priced into the contract. Multi-site hub, data-heavy workload or a building that resells connectivity: order 10Gbps, and make sure the firewall and switching can terminate it at line rate before the circuit goes live. In both cases, compare every carrier at the postcode rather than the one already in the building.

Price both for my postcode

This is the comparison growing businesses ask for when the 100Mbps circuit they bought three years ago is full and they want to size the next one properly. The short version: 1Gbps is the right order for nearly all of them, but the way it is ordered matters as much as the number, and that is where the 10Gbps question comes in. The 1Gbps cost guide and the 10Gbps cost guide hold the regional pricing; this page is about the decision between them.

How much bandwidth does an office actually use?

Less than its buyers assume. A 200-person office on Microsoft 365, hosted telephony and daily video meetings typically peaks at a few hundred megabits, with the average far lower. What makes a gigabit circuit feel essential is not throughput but the things a leased line gives at any speed: symmetric upload, no contention and a fix-time SLA. A 1Gbps circuit gives that office two or three times its peak as headroom, which is exactly what you want. A 10Gbps circuit gives it twenty-five times its peak, which is capacity you are paying to leave idle. Gigabit-capable networks passed 87% of UK premises by Q3 2025 (Ofcom Connected Nations 2025), so a 1Gbps bearer is now the default build at most addresses and 10Gbps is usually a bearer upgrade rather than a new route.

Who genuinely needs 10Gbps

Four kinds of buyer. Campuses and head offices that aggregate several hundred or several thousand users, their telephony and their guest networks onto one circuit. Data-heavy operations: media production, engineering firms moving CAD and simulation data, research groups, and anyone replicating storage to the cloud or a second site every night, where the job either finishes inside the window or it does not. Buildings that are the product: multi-tenant offices, co-working operators and managed-service providers selling bandwidth to the companies inside, where ten gigabits is divided many ways. And multi-site businesses that bring branch traffic back to one hub over private links. If you recognise your business in that list, 10Gbps is the right order and the multi-gigabit cost guide shows what the band is quoted at by region. If you do not, it probably is not.

The bearer decision matters more than the speed decision

Every leased line has two numbers: the bearer, which is the physical capacity of the fibre and optics installed, and the committed rate, which is the bandwidth you pay for. Historically a 1Gbps service came on a 1Gbps bearer. In well-served commercial postcodes carriers now install 10Gbps bearers as standard and price the committed rate, so a 10Gbps bearer carrying 1Gbps or 2Gbps lands close to a plain gigabit price. The consequence is that the expensive mistake is not choosing 1Gbps over 10Gbps; it is accepting a 1Gbps bearer at a site that will outgrow it, because the upgrade is then a new circuit, a new survey and another 30 to 90 working-day wait. Ask for the bearer in writing and have the upgrade price per step put in the contract.

What 10Gbps costs beyond the circuit

The hand-off above 1Gbps is a 10GBASE optical interface, and the firewall, router and core switch have to terminate it at line rate. A 10Gbps circuit behind a 1Gbps firewall port is a 1Gbps connection with a larger invoice. Budget the equipment refresh alongside the circuit, or order the 10Gbps bearer with a 1Gbps committed rate on a 1GBASE hand-off and plan the refresh for the upgrade. Multi-gigabit orders are also likelier to need new optics at the exchange or new fibre into the building, so the lead time can run past the usual 30 to 90 working days and an excess construction charge is more likely where no high-capacity fibre reaches the site yet.

Pricing both at the postcode

Entry pricing for 1Gbps from £129/month and 10Gbps from £349/month applies in postcodes where several carriers already have fibre in the building. Elsewhere both tiers rise toward £1,200 or more and the gap between them changes shape, which is why the comparison is only meaningful as a multi-carrier quote for your address. The UK leased line cost breakdown covers every tier, and the UK leased line providers comparison sets out which carriers are strong at multi-gigabit speeds. Whichever you order, design in backup connectivity on a different network from the start; a site that justifies a gigabit of dedicated capacity cannot usually afford to be offline while it is repaired.

Price 1Gbps and 10Gbps side by side for your postcode

Enter your business postcode and we quote 1Gbps, 10Gbps and the 10Gbps-bearer options from every carrier that reaches the building, so the gap is a real number rather than a rate card. Typically within 24 hours.

What speed do you need?

Indicative price for 1 Gbps: from £129/mo - exact quote for your postcode in minutes.

No obligation, no sales pressure. "From" prices are indicative; your exact price depends on your postcode, the bearer and the committed rate.

1Gbps vs 10Gbps Leased Line FAQs

Price 1Gbps and 10Gbps for Your Postcode

AMVIA quotes 1Gbps, 10Gbps and the 10Gbps-bearer options from every carrier at your address, with the bearer and committed rate stated on each. No obligation, no sales pressure.