Countdown until the UK analogue phone switch-off on 31 January 2027.Is your business affected?

200Mbps to 500Mbps Leased Line Costs in the UK

The median quoted price for a 200Mbps to 500Mbps leased line in the UK is £282 a month (n=115 quotes, AMVIA corpus, as of 8 August 2026), with the middle half of quotes between £245 and £309. This guide shows what the band is quoted at in each region, how it compares with 1Gbps, and what to budget beyond the monthly rental.

FreeNo commitmentResponse within 2 hours

£282/mo
median quoted monthly price, 200Mbps to 500Mbps leased lines, UK-wide, all quotes (n=115, as of 8 August 2026)
55 days
median order-to-live for delivered 200Mbps to 500Mbps leased lines, 2023 to 2025 (n=10, a small sample)
£2,197
median quoted excess construction charge where build work is needed, UK leased-line orders (n=97)
Trusted by
HBO
eHarmony
Hyundai
St Mary's
NHS
Sony
Vistry Group
HBO
eHarmony
Hyundai
St Mary's
NHS
Sony
Vistry Group

Quick answer: what does a 200Mbps to 500Mbps leased line cost?

A 200Mbps to 500Mbps leased line is quoted at a median of £282 a month across the UK, with the middle half of quotes between £245 and £309 (n=115, all quotes, all contract terms, AMVIA corpus as of 8 August 2026). London has the lowest regional median at £208 (n=25). For comparison, the UK median for a full 1Gbps circuit in the same set is £319 (n=1,130), so the step up to gigabit is smaller than most buyers expect. Installation is often waived on a 36-month term; where fibre has to be built, the median quoted excess construction charge is £2,197 (n=97).

Compare quotes for your postcode

Check 200Mbps to 500Mbps pricing for your postcode

Enter your business postcode and we compare BT Openreach, Virgin Media Business, CityFibre, Zayo and more for your exact address. Tailored pricing typically lands within 24 hours.

What speed do you need?

No obligation, no sales pressure. Medians on this page are quoted amounts from the AMVIA corpus; your exact price depends on your postcode and carrier availability.

200Mbps to 500Mbps leased line quotes by region, as of 8 August 2026

Median quoted monthly price for the 200Mbps to 500Mbps band in each UK region, all quotes, all contract terms, from the AMVIA connectivity corpus (set 2026-08-08, method v1.0.0). Regions with fewer than five quotes show the feed's UK-wide roll-up and say so. These are quoted amounts, not transacted prices; the won-only view is published on the UK Business Connectivity Pricing Index.

East Midlands

Median quoted price
£316/mo
Middle half of quotes
£244 to £387
Quotes in sample
n=13

East of England

Median quoted price
£298/mo
Middle half of quotes
£276 to £314
Quotes in sample
n=5

London (lowest median)

Median quoted price
£208/mo
Middle half of quotes
£139 to £276
Quotes in sample
n=25

North East (UK-wide roll-up)

Median quoted price
£282/mo
Middle half of quotes
£245 to £309
Quotes in sample
n=115 UK-wide (regional sample under 5)

North West

Median quoted price
£272/mo
Middle half of quotes
£246 to £284
Quotes in sample
n=8

Scotland

Median quoted price
£296/mo
Middle half of quotes
£272 to £347
Quotes in sample
n=8

South East

Median quoted price
£266/mo
Middle half of quotes
£242 to £290
Quotes in sample
n=14

South West

Median quoted price
£277/mo
Middle half of quotes
£262 to £298
Quotes in sample
n=11

Wales (UK-wide roll-up)

Median quoted price
£282/mo
Middle half of quotes
£245 to £309
Quotes in sample
n=115 UK-wide (regional sample under 5)

West Midlands

Median quoted price
£302/mo
Middle half of quotes
£264 to £334
Quotes in sample
n=10

Yorkshire and the Humber

Median quoted price
£296/mo
Middle half of quotes
£282 to £387
Quotes in sample
n=15

What Drives the Price of a 200Mbps to 500Mbps Leased Line

The spread in the table above comes down to six factors. Most of them are about your address and your order, not the speed itself.

Distance to existing fibre

The dominant factor. Where a carrier already passes your building, a 200Mbps to 500Mbps circuit is priced off a standard install. Where fibre has to be extended, the monthly price rises and an excess construction charge can be added on top.

How many carriers compete for the postcode

London's lower median is a competition effect: several networks quote the same building. In regions with one or two networks per postcode the quotes bunch higher. A multi-carrier comparison finds the cheapest fibre route for your address rather than one rate card.

Bearer and committed rate

Nearly every 200Mbps to 500Mbps service is delivered on a 1Gbps bearer, or a 10Gbps bearer in the best-served city postcodes. The fibre and the equipment cost the carrier roughly the same as a full gigabit circuit, so the discount for committing less bandwidth is real but modest, and an upgrade later is a configuration change, not a new install.

Contract length

Most carriers price 36-month terms sharpest and waive installation at that length. Twelve and 24-month terms carry a higher monthly rental and usually an install charge.

SLA level

AMVIA's 100% availability SLA with a five-hour return to service comes as standard. Enhanced SLAs with faster fault-response targets add to the monthly price.

Installation complexity

Wayleaves, listed buildings, long private approaches and shared landlord risers add engineering cost and lead time. The site survey confirms the final figure before you are committed, which is why the survey should come before the contract, not after.

Who is a 200Mbps to 500Mbps leased line right for?

The band sits between the entry-level 100Mbps circuit and a full 1Gbps leased line. It suits sites of roughly 30 to 150 staff that have moved their core systems to the cloud, run voice and video over the same connection, and need the symmetric upload and the SLA that business broadband cannot give them, but do not yet move the volume of data that justifies committing a full gigabit. Design studios pushing large files to clients, professional-services firms on Microsoft 365 with hosted telephony, and multi-tenant offices sharing one circuit are the typical buyers.

Because a leased line is uncontended, 500Mbps dedicated is 500Mbps up and down at nine in the morning as well as at midnight. A 500Mbps business broadband product shares its capacity with the street and its upload is a fraction of the headline figure.

How to read the regional table

Every figure in the table and the quick answer comes from AMVIA's published connectivity corpus: the aggregate of real quotes issued to UK businesses, with no customer identifiers, every cell built from at least five quotes, and each figure stamped with its as-of date and sample size. The numbers are quoted amounts, which is the view you see when you go to market; the won-only view, which is closer to a transacted price, is published separately on the UK Business Connectivity Pricing Index and the two are never blended. The rules for how cells are built, rolled up and suppressed are on the methodology page. Regions whose sample for this band is under the publishing threshold show the UK-wide roll-up and are labelled as such; nothing is interpolated.

Treat the median as the price a typical quote lands at, not a price list. The middle-half range tells you how much the postcode matters: a site with two or three networks already in the building sits at the bottom of it, a site that needs new duct sits at the top or above it.

The gap between this band and 1Gbps is small, and that matters

Look at the UK medians for this band and for 1Gbps in the quick answer. The two are close because carriers deliver 200Mbps to 500Mbps services on a 1Gbps bearer. The fibre, the optics and the installation cost the carrier the same; the saving is the committed bandwidth. Two consequences follow. First, if your headcount or your data volume is growing, pricing 1Gbps alongside this band is worth the extra line on the quote, because the uplift is often less than a second installation would cost you in two years' time. Second, if you do take 200Mbps or 500Mbps, confirm in writing that the bearer is 1Gbps so an upgrade is a configuration change rather than a new order. The full UK leased line cost breakdown covers every tier side by side.

Lead times and one-off costs

Delivered circuits in this band have a shorter median order-to-live time than 1Gbps in the corpus, but the sample is small and the slowest tenth still runs well past six months, so plan on three months and keep a 4G or 5G router as a bridge if the move date is fixed. Installation is usually waived on a 36-month term. The one-off cost to plan for is the excess construction charge, levied when a carrier has to build fibre to the premises; the corpus distribution for ECCs is published on the excess construction charges page, and the single best way to avoid one is to have every carrier survey the address before you sign with any of them. Pairing the circuit with backup connectivity on a different network protects against the outages that an SLA compensates for but cannot prevent.

How to get the best price in this band

Commit to 36 months, ask for the committed rate to be priced on a 1Gbps bearer, and compare every carrier that reaches the postcode rather than renewing with the incumbent. AMVIA runs that comparison across BT Openreach, Virgin Media Business, CityFibre, Zayo and the regional networks, surfaces any construction charge before you commit, and manages the install end to end. Start with your postcode and a tailored quote typically lands within 24 hours.

200Mbps to 500Mbps Leased Line Cost FAQs

Get 200Mbps to 500Mbps Leased Line Prices for Your Postcode

AMVIA checks availability and pricing across BT Openreach, Virgin Media Business, CityFibre, Zayo and more at your postcode, and prices 1Gbps alongside so you can see the gap for yourself. No obligation, no sales pressure.

RatedPeople.com runs its London HQ on AMVIA high-availability connectivity.Read the case study →